DESIGN-BUILD
Design-Build Services
​
At Datum Construction, we offer a fully integrated design-build delivery method that consolidates responsibility for both the design and construction phases under a single contract. This streamlined approach eliminates inefficiencies found in traditional construction methods, resulting in faster delivery, improved communication, and greater project cost control.
​
Unlike the conventional design-bid-build model—where the client manages multiple contracts between architects, engineers, and contractors—our design-build solution provides a unified team with aligned goals. From project conception through final completion, you work with a single entity that is fully accountable for scope, schedule, quality, and budget.
​​

What Sets Our Design-Build Method Apart
-
Centralized accountability – We contract directly with architects and engineers, providing a single source of responsibility throughout the project lifecycle
-
Seamless collaboration – Our integrated design and construction teams work side-by-side to reduce miscommunication and improve efficiency
-
Accelerated schedules – By overlapping design and construction phases, we shorten delivery timeframes and identify potential delays before they occur
-
Improved cost control – Early cost input and ongoing value engineering reduce budget risks, minimize change orders, and enhance overall financial visibility
-
Fewer surprises, more certainty – Continuous collaboration enables quick decision-making and ensures that the owner’s vision is maintained from initial concepts to final build
-
Enhanced design execution – Our hands-on involvement from day one ensures the project is designed for constructability, minimizing rework and misalignment later
​
Our Design-Build Services Include:
​
-
Initial concept development, programming, and feasibility studies based on client objectives and project goals
-
Selection and management of architectural and engineering partners tailored to the project scope and complexity
-
Detailed cost estimating and budgeting from schematic design through construction documents
-
Permitting strategy, code compliance coordination, and jurisdictional approvals
-
Constructability reviews and design input to ensure building solutions are efficient and practical
-
Project scheduling that aligns with client timelines and allows phased construction when beneficial
-
Early identification of critical path items and long-lead materials to mitigate procurement risks
-
Transparent value engineering recommendations to identify potential design and material alternatives
-
Risk assessment and mitigation planning, including insurance coordination and contingency preparation
-
Continuous cost monitoring, reporting, and scope management
-
Development of a detailed site logistics and safety plan
-
Coordination with local authorities, utility providers, and stakeholders during the pre-construction and construction phases
-
Full construction oversight, quality control, and commissioning support through project closeout